首页 社会内容详情
新2网址最新登录(www.99cx.vip):GCAP completes 309.28 KWp solar PV systems

新2网址最新登录(www.99cx.vip):GCAP completes 309.28 KWp solar PV systems

分类:社会

网址:

SEO查询: 爱站网 站长工具

点击直达

新二皇冠最新手机登录www.99cx.vip)实时更新发布最新最快最有效的新二皇冠最新手机登录网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

G Capital Bhd executive director Datuk Yap Yee Ping

KUALA LUMPUR: G Capital Bhd’s (GCAP) 70%-owned subsidiary, Solarcity Malaysia Sdn Bhd has completed the installation and commenced operation of a 309.28 KWp Solar Photovoltaic electric power generation system (Solar PV System).

The solar PV is for the supplemental power purchase agreement (PPA) with Muda Paper Converting Sdn Bhd, a wholly-owned subsidiary of Muda Holdings Bhd inked on May 30.

,

新2网址最新登录www.99cx.vip)实时更新发布最新最快最有效的新2最新登录网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

,

"I’m pleased to witness the completion and commissioning of 309.28 KWp add-on to Muda Paper Converting. All these small yet crucial delivery of promises will help Malaysia in reaching the target set in Renewable Energy Transition Roadmap 2035,” executive director Datuk Yap Yee Ping said in a statement.

The plant will be contributing revenue and earnings to GCAP over a span of 25 years from Aug 19, 2022, the commercial operation date.

“With the completion of the 309.28 KWp solar PV systems in Simpang Ampat, this brings our total installed solar PV systems capacity to 15.6MWp inception-to-date,” Yap said.


转载说明:本文转载自Sunbet。
 当前暂无评论,快来抢沙发吧~

发布评论